28 october 2016

(the rain finally ceased)
(but it was still cold + wet)
(slept in central park)

(the southeast sidewalk is still closed “for construction”)
(entrance to the 59th + 5th station is inaccessible from that sidewalk)

2 Trackbacks / Pingbacks

  1. friday | *JoGa Jungle*
  2. “friday” (log) | *JoGa Jungle*

Comments are closed.